In line with the new circular of the Hellenic Fire Service Headquarters (ref. 60013 oik. F.701.45.4 / 22.10.2026). From site inspection and study to implementation of the measures, turnkey.
📞 Book a site inspection: +30 694 468 0410 ✉️ info@ecoenergysystems.gr
In October 2026 the Hellenic Fire Service Headquarters introduced a single fire protection framework for ground-mounted photovoltaic stations in rural areas. The circular sets the minimum passive, preventive and active measures, the Fire Risk Assessment Study, the Emergency Response Plan and staff training. It also repeals, for photovoltaics, the older Order 44761/2011.
| Station | What applies |
|---|---|
| New station | Fire protection study and Fire Risk Assessment Study before construction. |
| Existing station | Adaptation as far as practically feasible, within 3 years of publication, following a survey, site inspection and risk assessment. |
| Repowering, extension or capacity increase | The new parts must comply in full. |
The Risk Assessment Study is updated at least every five years, and after every substantial change (extension, repowering, equipment change, added storage), after a fire incident or a severe weather event.
This list is indicative. The measures for each station are set by the Risk Assessment Study, depending on its size, technology (fixed mounts or trackers) and location.
Yes. The circular applies to all ground-mounted photovoltaic stations, regardless of capacity. The only exceptions are systems on buildings, small self-consumption systems within a property and floating stations.
Existing stations must be adapted within 3 years of the circular's publication, as far as practically feasible. The first step is the site inspection and risk assessment. The sooner it is done, the more smoothly the works and costs can be planned.
In a repowering, extension or capacity increase, the new parts of the station must comply fully with the circular.
Battery storage systems require a separate, dedicated fire protection study, and the interface with the PV system is examined in both studies. We can take on both.
The cost depends on the size of the station, its location and the existing equipment, and is given after the site inspection. Contact us to book an appointment.
We serve solar parks in Ilia, Achaia, Messinia and more widely in Western Greece and the Peloponnese.
📞 694 468 0410 ✉️ info@ecoenergysystems.gr
Tell us the capacity and location of the park and we will call you to arrange a site inspection.
ECO ENERGY SYSTEMS – Athanasios Fotopoulos, Mechanical Engineer · Ermou 36, Amaliada
Source: Hellenic Fire Service circular "Fire Protection of Ground-Mounted Photovoltaic Power Stations in Rural Areas", ref. 60013 oik. F.701.45.4 / 22.10.2026 (ADA: 9ΧΦΞ46ΝΠΙΘ-Ε21).