{"id":4268,"date":"2026-10-30T10:27:17","date_gmt":"2026-10-30T07:27:17","guid":{"rendered":"https:\/\/ecoenergysystems.gr\/?p=4268"},"modified":"2026-10-30T10:27:19","modified_gmt":"2026-10-30T07:27:19","slug":"nea-egkyklios-pyroprostasias-fotovoltaika-parka","status":"publish","type":"post","link":"https:\/\/ecoenergysystems.gr\/en\/nea-egkyklios-pyroprostasias-fotovoltaika-parka\/","title":{"rendered":"\u039d\u03ad\u03b1 \u03b5\u03b3\u03ba\u03cd\u03ba\u03bb\u03b9\u03bf\u03c2 \u03c0\u03c5\u03c1\u03bf\u03c0\u03c1\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03b1\u03c2 \u03b3\u03b9\u03b1 \u03c4\u03b1 \u03c6\u03c9\u03c4\u03bf\u03b2\u03bf\u03bb\u03c4\u03b1\u03ca\u03ba\u03ac \u03c0\u03ac\u03c1\u03ba\u03b1: \u03c4\u03b9 \u03b1\u03bb\u03bb\u03ac\u03b6\u03b5\u03b9 \u03b3\u03b9\u03b1 \u03c4\u03bf\u03c5\u03c2 \u03b9\u03b4\u03b9\u03bf\u03ba\u03c4\u03ae\u03c4\u03b5\u03c2"},"content":{"rendered":"<p>On 22 October 2026 the Hellenic Fire Service Headquarters issued a circular titled \"Fire Protection of Ground-Mounted Photovoltaic Power Stations in Rural Areas\". For the first time there is a single framework of measures for solar parks, and it directly concerns every owner, from a small 100 kW agricultural park to large stations.<\/p>\n\n\n\n<p>As engineers who design and build solar parks, we have read the circular in detail. Below is what an owner needs to know, without the legal jargon.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Who it applies to<\/h2>\n\n\n\n<p>All photovoltaic stations <strong>mounted on the ground<\/strong>, regardless of capacity. It does not apply to PV on roofs, small self-consumption systems within a property, or floating stations. If the park also has batteries (BESS), these need a separate, dedicated fire protection study.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Deadlines<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>New park:<\/strong> the fire protection study is carried out before construction.<\/li>\n\n\n\n<li><strong>Park in operation:<\/strong> must be brought into line within 3 years, after a site inspection and risk assessment.<\/li>\n\n\n\n<li><strong>Repowering, extension or capacity increase:<\/strong> the new parts must comply fully from the start.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">What needs to be done in practice<\/h2>\n\n\n\n<p>The core is the <strong>fire protection study<\/strong> by a qualified engineer, which includes the <strong>Fire Risk Assessment Study<\/strong> and is filed with the Fire Service. The study examines the park itself and its surroundings: vegetation, neighbouring fields and forests, fire engine access, equipment. On this basis it sets the measures.<\/p>\n\n\n\n<p>For most parks in our area, the measures will be specific: a firebreak at least 3 metres wide along the fence, a vegetation clearing programme, fire engine access, a DC-side isolation device, lightning protection, fire extinguishers and signage. The owner also needs an <strong>Emergency Response Plan<\/strong> and training for everyone working at the park, while the risk assessment is updated at least every five years.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why not to leave the 3 years to run out<\/h2>\n\n\n\n<p>The deadline sounds long, but the first step \u2013 the site inspection and risk assessment \u2013 shows what the park needs and what it will cost. With that in hand, the works can be scheduled calmly, outside the fire season and together with routine maintenance. Left to the end, they will be rushed, when everyone is trying to do the same at once.<\/p>\n\n\n\n<p>And one more thing: a park with documented fire protection is safer for the owner, the neighbours and the investment.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How we can help<\/h2>\n\n\n\n<p>We handle the whole process: site inspection, fire protection study with risk assessment, Emergency Response Plan and implementation of the measures, under a single contract. See the full service on the page <a href=\"https:\/\/ecoenergysystems.gr\/en\/meleti-pyroprostasias-fotovoltaikou-parkou\/\">Fire protection study for solar parks<\/a>, or call us on <a href=\"tel:+306944680410\">694 468 0410<\/a> to book a site inspection.<\/p>\n\n\n\n<p><em>Athanasios Fotopoulos, Mechanical Engineer, ECO ENERGY SYSTEMS, Amaliada<\/em><\/p>\n\n\n\n<p><em>Source: Hellenic Fire Service circular, ref. 60013 oik. F.701.45.4 \/ 22.10.2026 (ADA: 9\u03a7\u03a6\u039e46\u039d\u03a0\u0399\u0398-\u039521).<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>\u0397 \u03bd\u03ad\u03b1 \u03b5\u03b3\u03ba\u03cd\u03ba\u03bb\u03b9\u03bf\u03c2 \u03c4\u03bf\u03c5 \u03a0\u03c5\u03c1\u03bf\u03c3\u03b2\u03b5\u03c3\u03c4\u03b9\u03ba\u03bf\u03cd \u03a3\u03ce\u03bc\u03b1\u03c4\u03bf\u03c2 (\u039f\u03ba\u03c4. 2026) \u03b1\u03c6\u03bf\u03c1\u03ac \u03ba\u03ac\u03b8\u03b5 \u03c6\u03c9\u03c4\u03bf\u03b2\u03bf\u03bb\u03c4\u03b1\u03ca\u03ba\u03cc \u03c0\u03ac\u03c1\u03ba\u03bf \u03b5\u03c0\u03af \u03b5\u03b4\u03ac\u03c6\u03bf\u03c5\u03c2. \u03a0\u03bf\u03b9\u03bf\u03c5\u03c2 \u03b1\u03c6\u03bf\u03c1\u03ac, \u03bc\u03ad\u03c7\u03c1\u03b9 \u03c0\u03cc\u03c4\u03b5, \u03c4\u03b9 \u03c0\u03c1\u03ad\u03c0\u03b5\u03b9 \u03bd\u03b1 \u03b3\u03af\u03bd\u03b5\u03b9, \u03b5\u03be\u03b7\u03b3\u03b7\u03bc\u03ad\u03bd\u03b1 \u03b1\u03c0\u03cc \u03bc\u03b7\u03c7\u03b1\u03bd\u03b9\u03ba\u03cc.<\/p>","protected":false},"author":2,"featured_media":4270,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-4268","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","vs-blog blog-single"],"_links":{"self":[{"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/posts\/4268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/comments?post=4268"}],"version-history":[{"count":1,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/posts\/4268\/revisions"}],"predecessor-version":[{"id":4269,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/posts\/4268\/revisions\/4269"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/media\/4270"}],"wp:attachment":[{"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/media?parent=4268"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/categories?post=4268"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/tags?post=4268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}