{"id":4264,"date":"2026-10-30T10:23:59","date_gmt":"2026-10-30T07:23:59","guid":{"rendered":"https:\/\/ecoenergysystems.gr\/?page_id=4264"},"modified":"2026-10-30T11:50:48","modified_gmt":"2026-10-30T08:50:48","slug":"meleti-pyroprostasias-fotovoltaikou-parkou","status":"publish","type":"page","link":"https:\/\/ecoenergysystems.gr\/en\/meleti-pyroprostasias-fotovoltaikou-parkou\/","title":{"rendered":"Fire protection study for solar parks"},"content":{"rendered":"<style>\n.eco-pv{--navy:#13294b;--red:#c8102e;--ink:#1f2933;--muted:#5b6670;--line:#e3e7ec;--soft:#f5f7fa;color:var(--ink);line-height:1.65;max-width:860px;margin:0 auto}\n.eco-pv h1{color:var(--navy);font-size:32px;line-height:1.25;margin:8px 0 12px}\n.eco-pv h2{color:var(--navy);font-size:23px;margin:36px 0 10px;border-left:4px solid var(--red);padding-left:10px}\n.eco-pv h3{color:var(--navy);font-size:18px;margin:20px 0 6px}\n.eco-pv .lead{font-size:18px;color:var(--muted)}\n.eco-pv .box{background:var(--soft);border:1px solid var(--line);border-radius:8px;padding:16px 20px;margin:16px 0}\n.eco-pv a.cta{display:inline-block;background:var(--red);color:#fff!important;text-decoration:none;padding:12px 22px;border-radius:6px;font-weight:600;margin:6px 8px 6px 0}\n.eco-pv a.cta.alt{background:var(--navy)}\n.eco-pv table{width:100%;border-collapse:collapse;margin:12px 0;font-size:15px}\n.eco-pv th,.eco-pv td{border:1px solid var(--line);padding:9px 10px;text-align:left;vertical-align:top}\n.eco-pv th{background:var(--soft);color:var(--navy)}\n.eco-pv .small{font-size:13px;color:var(--muted)}\n.eco-pv details{border:1px solid var(--line);border-radius:6px;padding:10px 14px;margin:8px 0}\n.eco-pv summary{font-weight:600;color:var(--navy);cursor:pointer}\n.eco-pv .box .form-title{display:none}\n<\/style>\n<div class=\"eco-pv\">\n<h1>Fire protection study for solar parks<\/h1>\n<p class=\"lead\">In line with the new circular of the Hellenic Fire Service Headquarters (ref. 60013 oik. F.701.45.4 \/ 22.10.2026). From site inspection and study to implementation of the measures, turnkey.<\/p>\n<p><a class=\"cta\" href=\"tel:+306944680410\">\ud83d\udcde Book a site inspection: +30 694 468 0410<\/a> <a class=\"cta alt\" href=\"mailto:info@ecoenergysystems.gr\">\u2709\ufe0f info@ecoenergysystems.gr<\/a><\/p>\n<h2>What changes with the new circular<\/h2>\n<p>In October 2026 the Hellenic Fire Service Headquarters introduced a single fire protection framework for ground-mounted photovoltaic stations in rural areas. The circular sets the minimum passive, preventive and active measures, the Fire Risk Assessment Study, the Emergency Response Plan and staff training. It also repeals, for photovoltaics, the older Order 44761\/2011.<\/p>\n<div class=\"box\"><b>Which stations it applies to:<\/b> all ground-mounted photovoltaic stations, <b>regardless of capacity<\/b>.<br><b>It does not apply to:<\/b> PV on roofs, terraces, fa\u00e7ades and canopies, small-scale self-consumption systems within a property, or floating stations. Storage stations and battery systems (BESS) combined with PV require a <b>separate, dedicated fire protection study<\/b>.<\/div>\n<h2>Deadlines<\/h2>\n<table><tr><th>Station<\/th><th>What applies<\/th><\/tr>\n<tr><td>New station<\/td><td>Fire protection study and Fire Risk Assessment Study <b>before construction<\/b>.<\/td><\/tr>\n<tr><td>Existing station<\/td><td>Adaptation as far as practically feasible, <b>within 3 years<\/b> of publication, following a survey, site inspection and risk assessment.<\/td><\/tr>\n<tr><td>Repowering, extension or capacity increase<\/td><td>The new parts must comply <b>in full<\/b>.<\/td><\/tr><\/table>\n<p>The Risk Assessment Study is updated <b>at least every five years<\/b>, and after every substantial change (extension, repowering, equipment change, added storage), after a fire incident or a severe weather event.<\/p>\n<h2>What the station owner must do<\/h2>\n<ol><li><b>Fire protection study<\/b> by a qualified engineer, which includes the <b>Fire Risk Assessment Study<\/b> and is filed in accordance with Article 4 of Fire Service Regulation 13\/2021.<\/li>\n<li><b>Implementation of the measures<\/b> that result from the study. Where required for the operating licence, correct installation is certified by a solemn declaration of a qualified engineer.<\/li>\n<li><b>Emergency Response Plan<\/b>, made available to the local Fire Service.<\/li>\n<li><b>Training of the staff<\/b> for operation and maintenance, and of external contractors.<\/li><\/ol>\n<h2>Key measures in a solar park<\/h2>\n<h3>Site, vegetation and access<\/h3>\n<ul><li>A firebreak free of combustible vegetation, at least <b>3 m<\/b> wide along the fence, within the site.<\/li>\n<li>A vegetation management programme under the panels and around the equipment, especially before and during the fire season.<\/li>\n<li>Passable access for fire engines and a perimeter road about <b>6 m<\/b>wide, with turning points.<\/li>\n<li>Fence at least <b>2,0 m<\/b>high, with gates that allow fire engines through.<\/li><\/ul>\n<h3>Electrical installation<\/h3>\n<ul><li>A clearly visible, labelled <b>DC-side isolation device<\/b> for use by the Fire Service.<\/li>\n<li><b>Lightning protection<\/b> based on a risk analysis according to ELOT EN 62305, with equipotential bonding and earthing of the mountings.<\/li>\n<li>Inverters and panels on a non-combustible surface with adequate ventilation, and cabling protected against mechanical damage, rodents and moisture.<\/li><\/ul>\n<h3>Detection, fire fighting and signage<\/h3>\n<ul><li>Automatic heat or smoke detection in inverter stations, medium-voltage rooms and the control centre, where the study requires it.<\/li>\n<li>Portable fire extinguishers suitable for electrical fires, in the number and positions set by the study, and a fire blanket to ELOT EN 1869.<\/li>\n<li>\"PHOTOVOLTAIC INSTALLATION\" signage, warning that the panels remain live, and a Fire Service information file at the entrance.<\/li><\/ul>\n<p class=\"small\">This list is indicative. The measures for each station are set by the Risk Assessment Study, depending on its size, technology (fixed mounts or trackers) and location.<\/p>\n<h2>How we work<\/h2>\n<ol><li><b>Site inspection and survey<\/b> of the station and its surroundings: vegetation, proximity to forests, access, equipment.<\/li>\n<li><b>Fire protection study and Fire Risk Assessment Study<\/b>, with drawings.<\/li>\n<li><b>Emergency Response Plan<\/b> and staff training instructions.<\/li>\n<li><b>Implementation of the measures<\/b>: signage, fire extinguishers, DC isolation devices, lightning protection, detection. A single contract, from the study to the installation.<\/li><\/ol>\n<div class=\"box\"><b>Why ECO ENERGY SYSTEMS:<\/b> we are engineers who design <b>and build<\/b> solar PV. We carry out installations and repowering of solar parks, so we know the installation from the strings to the main panel. The study we deliver works in practice, not just on paper.<\/div>\n<h2>Frequently asked questions<\/h2>\n<details><summary>My park is small (e.g. 100 kW). Does this apply to me?<\/summary><p>Yes. The circular applies to all ground-mounted photovoltaic stations, regardless of capacity. The only exceptions are systems on buildings, small self-consumption systems within a property and floating stations.<\/p><\/details>\n<details><summary>I have a park in operation. What is my deadline?<\/summary><p>Existing stations must be adapted within 3 years of the circular's publication, as far as practically feasible. The first step is the site inspection and risk assessment. The sooner it is done, the more smoothly the works and costs can be planned.<\/p><\/details>\n<details><summary>I'm repowering or extending. What applies?<\/summary><p>In a repowering, extension or capacity increase, the new parts of the station must comply fully with the circular.<\/p><\/details>\n<details><summary>I also have batteries (BESS) at the park.<\/summary><p>Battery storage systems require a separate, dedicated fire protection study, and the interface with the PV system is examined in both studies. We can take on both.<\/p><\/details>\n<details><summary>How much does the study cost?<\/summary><p>The cost depends on the size of the station, its location and the existing equipment, and is given after the site inspection. Contact us to book an appointment.<\/p><\/details>\n<h2>Book a site inspection for your park<\/h2>\n<p>We serve solar parks in Ilia, Achaia, Messinia and more widely in Western Greece and the Peloponnese.<\/p>\n<p><a class=\"cta\" href=\"tel:+306944680410\">\ud83d\udcde 694 468 0410<\/a> <a class=\"cta alt\" href=\"mailto:info@ecoenergysystems.gr\">\u2709\ufe0f info@ecoenergysystems.gr<\/a><\/p>\n<div class=\"box\" style=\"margin-top:22px\"><h3 style=\"margin-top:4px\">Or send us a message<\/h3><p>Tell us the capacity and location of the park and we will call you to arrange a site inspection.<\/p>\n\n<div class=\"wpcf7 no-js\" id=\"wpcf7-f76-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"76\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/en\/wp-json\/wp\/v2\/pages\/4264#wpcf7-f76-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\" data-trp-original-action=\"\/en\/wp-json\/wp\/v2\/pages\/4264#wpcf7-f76-o1\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"76\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.1.4\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f76-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<div class=\"form-style2 layout2 ajax-contact\">\n<h3 class=\"form-title\">Contact us<\/h3>\n<div class=\"row\">\n<div class=\"col-12 form-group\"><label for=\"name\">Full name<\/label><span class=\"wpcf7-form-control-wrap\" data-name=\"text-624\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" id=\"name\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Your name\" value=\"\" type=\"text\" name=\"text-624\" \/><\/span><\/div>\n<div class=\"col-md-6 form-group\"><label for=\"email\">Email<\/label><span class=\"wpcf7-form-control-wrap\" data-name=\"email-299\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" id=\"email\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Email\" value=\"\" type=\"email\" name=\"email-299\" \/><\/span><\/div>\n<div class=\"col-md-6 form-group\"><label for=\"number\">Phone<\/label><span class=\"wpcf7-form-control-wrap\" data-name=\"text-70\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text\" id=\"number\" aria-invalid=\"false\" placeholder=\"Your phone\" value=\"\" type=\"text\" name=\"text-70\" \/><\/span><\/div>\n<div class=\"col-12 form-group\"><label for=\"message\">Message<\/label><span class=\"wpcf7-form-control-wrap\" data-name=\"textarea-349\"><textarea cols=\"40\" rows=\"10\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea wpcf7-validates-as-required\" id=\"message\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Message\" name=\"textarea-349\"><\/textarea><\/span><\/div>\n<div class=\"col-12 form-group\"><button type=\"submit\" class=\"vs-btn wpcf7-submit\">Send<\/button><\/div>\n<\/div><\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<input type=\"hidden\" name=\"trp-form-language\" value=\"en\"\/><\/form>\n<\/div>\n\n<\/div>\n<p class=\"small\">ECO ENERGY SYSTEMS \u2013 Athanasios Fotopoulos, Mechanical Engineer \u00b7 Ermou 36, Amaliada<br>Source: Hellenic Fire Service circular \"Fire Protection of Ground-Mounted Photovoltaic Power Stations in Rural Areas\", ref. 60013 oik. F.701.45.4 \/ 22.10.2026 (ADA: 9\u03a7\u03a6\u039e46\u039d\u03a0\u0399\u0398-\u039521).<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u039c\u03b5\u03bb\u03ad\u03c4\u03b7 \u03c0\u03c5\u03c1\u03bf\u03c0\u03c1\u03bf\u03c3\u03c4\u03b1\u03c3\u03af\u03b1\u03c2 \u03ba\u03b1\u03b9 \u039c\u03b5\u03bb\u03ad\u03c4\u03b7 \u0395\u03ba\u03c4\u03af\u03bc\u03b7\u03c3\u03b7\u03c2 \u039a\u03b9\u03bd\u03b4\u03cd\u03bd\u03bf\u03c5 \u03a0\u03c5\u03c1\u03ba\u03b1\u03b3\u03b9\u03ac\u03c2 \u03b3\u03b9\u03b1 \u03c6\u03c9\u03c4\u03bf\u03b2\u03bf\u03bb\u03c4\u03b1\u03ca\u03ba\u03ac \u03c0\u03ac\u03c1\u03ba\u03b1, \u03c3\u03cd\u03bc\u03c6\u03c9\u03bd\u03b1 \u03bc\u03b5 \u03c4\u03b7 \u03bd\u03ad\u03b1 \u03b5\u03b3\u03ba\u03cd\u03ba\u03bb\u03b9\u03bf \u03c4\u03bf\u03c5 \u03a0\u03c5\u03c1\u03bf\u03c3\u03b2\u03b5\u03c3\u03c4\u03b9\u03ba\u03bf\u03cd \u03a3\u03ce\u03bc\u03b1\u03c4\u03bf\u03c2 (\u039f\u03ba\u03c4. 2026). \u0391\u03c5\u03c4\u03bf\u03c8\u03af\u03b1, \u03bc\u03b5\u03bb\u03ad\u03c4\u03b7 \u03ba\u03b1\u03b9 \u03c5\u03bb\u03bf\u03c0\u03bf\u03af\u03b7\u03c3\u03b7 \u03bc\u03ad\u03c4\u03c1\u03c9\u03bd \u03c3\u03b5 \u0397\u03bb\u03b5\u03af\u03b1, \u0391\u03c7\u03b1\u0390\u03b1, \u039c\u03b5\u03c3\u03c3\u03b7\u03bd\u03af\u03b1.<\/p>","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-4264","page","type-page","status-publish","hentry","page--item"],"_links":{"self":[{"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/pages\/4264","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/comments?post=4264"}],"version-history":[{"count":3,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/pages\/4264\/revisions"}],"predecessor-version":[{"id":4274,"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/pages\/4264\/revisions\/4274"}],"wp:attachment":[{"href":"https:\/\/ecoenergysystems.gr\/en\/wp-json\/wp\/v2\/media?parent=4264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}